← MeoMock / Written exams
Class 2 (2nd Engineer) MEP 📅 Jan 2026

Exam Question

Q6 As a second engineer in a ocean going ship, what actions you will take if the specification of the bunkers received in the last port is substantially different than the old bunkers with respect to: (16) (a) density (b) Viscosity (c) Cat fines (d) Sulphur content (e) Water content

Reference Answer

As a Second Engineer, upon receiving bunkers with specifications substantially different from the previous supply, a systematic and cautious approach is mandatory to ensure the safety of the vessel, prevent machinery damage, and maintain regulatory compliance. The following actions would be taken for each specified parameter:
### (a) Density
**1. Primary Concerns:**
* **Centrifugal Separator (Purifier) Inefficiency:** If the fuel density at 15°C is close to or exceeds 991 kg/m³, conventional purifiers will lose their water seal, leading to a complete failure of separation. This allows water and solid contaminants to pass to the service tank.

Full answer on MeoMock — surveyor-grade reference answers for 7,000+ written exam questions.

View plans Browse library

← Browse more questions

Prepare on Android — MeoMock on Google Play