← MeoMock / Written exams
Class 2 (2nd Engineer) MEP 📅 Mar 2018

Exam Question

Briefly describe your action plan on following exigencies:

(a) Leaky economizer tube, while at sea

(b) Leak intercooler of main air compressor, while maneuvering

Reference Answer

(a) Leaky economizer tube at sea:
Immediately inform the wheelhouse to stop the engine.
Take control of the Engine Control Room (ECR).
Maintain boiler water circulation pump operation. If the hot well level is low, top it up.

Full answer on MeoMock — surveyor-grade reference answers for 7,000+ written exam questions.

View plans Browse library

← Browse more questions

Prepare on Android — MeoMock on Google Play