Exam Question
(a) Describe measures which may be taken to improve the stability or trim of a damaged ships (6)
(b) A watertight bulkhead is 8 m high and is supported by vertical stiffeners 700 mm apart, connected at the tank top by brackets having 10 rivets 20 mm diameter. The bulkhead is flooded to its top edge with sea water. Determine:
(a) Shearing force at top of stiffeners,
(b) Shear stress in the rivets,
(c) Position of zero shear.