← MeoMock / Written exams
Class 2 (2nd Engineer) MEP 📅 Mar 2026

Exam Question

Describe the Hull Inspection that you would carry out as the senior engineer of a ship in dry dock stating what defects you may find and the repairs that may be necessary with respect to: (16) a) Shell plating. b) Ford end of ship. c) Aft end of ship. d) Openings in shell plating. e) Rudder. f) Propeller and stern tube.

Reference Answer

### Introduction: Dry Dock Hull Inspection Protocol
As the Senior Engineer, the hull inspection in dry dock is a critical survey to ensure the vessel's structural integrity, safety, and operational efficiency. The process is conducted systematically in coordination with the Classification Society Surveyor and the Superintendent. The initial step upon docking is the high-pressure fresh water washing of the entire hull to remove marine growth and fouling, allowing for a clear and detailed inspection.
---
### a) Shell Plating

Full answer on MeoMock — surveyor-grade reference answers for 7,000+ written exam questions.

View plans Browse library

← Browse more questions

Prepare on Android — MeoMock on Google Play