← MeoMock / Written exams
Class 2 (2nd Engineer) MEKM 📅 Jun 2023

Exam Question

Douring morning inspection after an overnight period of UMS operation the following changes were detected:

(i) A sight but perceptible change in engine noise.

(ii) An alteration in engine speed.

(iii) A change in exhaust temperature spread pattern.

(a) Explain, with reasons, the possible causes of such changes. (8)

(b) Indicate how normal operations might be restored. (8)

Reference Answer

Answer not yet available. Browse the exam library.

← Browse more questions

Prepare on Android — MeoMock on Google Play