(a) What are the requirements of Emergency Source of electrical power as per SOLAS Convention as amended, in cargo ships? (6)

(b) Name the services that are required to be supplied power from emergency source. (8)

(c) What are the starting arrangements for emergency generating sets? (6)

Reference Answer

### (a) Requirements of Emergency Source of Electrical Power (SOLAS Ch II-1, Reg 43)
As per the SOLAS Convention, the emergency source of electrical power on a cargo ship must be a self-contained unit, located above the uppermost continuous deck and outside machinery casings, ensuring its operation in case of fire or flooding in the main machinery spaces. Its primary requirements are:
1. **Sufficiency and Simultaneity**: The electrical power available must be sufficient to supply all services essential for safety in an emergency. Crucially, it must be capable of supplying these services *simultaneously*, taking into account the high starting currents of motors (e.g., fire pump) and the transient nature of other loads.
2. **Operational Duration**: The emergency source must be capable of operating for a specified minimum period, which for cargo ships is **18 hours**. Passenger ships have a 36-hour requirement.

Full answer on MeoMock — surveyor-grade reference answers for 7,000+ written exam questions.

View plans Browse library