← MeoMock / Written exams
Class 2 (2nd Engineer) MEP 📅 Jan 2026

Exam Question

Q5 Under Continuous survey of machinery (CSM) the bottom end bearing of a large slow speed engine is due for survey. (a) As Second Engineer, explain the procedure involved in complete inspection of a bottom end bearing. (8) (b) List the precaution to be taken during inspection. (4) (c) What tests are carried out on completion of survey and re-assembly. (4)

Reference Answer

### (a) Procedure for Complete Inspection of a Bottom End Bearing
As Second Engineer, the complete inspection of a bottom end bearing under CSM requires a systematic and meticulous approach. The procedure is as follows:
**1. Preparation and Safety:**
* **Permit to Work (PTW):** Obtain a valid PTW from the Chief Engineer and conduct a toolbox talk with the engine room team.

Full answer on MeoMock — surveyor-grade reference answers for 7,000+ written exam questions.

View plans Browse library

← Browse more questions

Prepare on Android — MeoMock on Google Play