← MeoMock / Written exams
Class 2 (2nd Engineer) SSEP 📅 Dec 2023

Exam Question

What is understood by risk on board a ship? As a second engineer discuss various methods for hazard identification and assessment of the potential risks on board. (20)

Exam question diagramExam question diagram

Reference Answer

Risk on board a ship refers to the combination of the likelihood of an event occurring and the potential consequences of that event. It encompasses the probability of harm to people, property, or the environment due to hazards present in the marine environment. As almost every task performed on a ship involves some level of risk, it is essential to analyze tasks for potential dangers and adopt measures to mitigate risks effectively.
Risk Assessment Process
Risk assessment involves the systematic evaluation of tasks to identify hazards, determine the likelihood of their occurrence, and evaluate their consequences. It aims to ensure that adequate precautions are in place to prevent accidents. The process involves the following key steps:
1. Identifying Hazards

Full answer on MeoMock — surveyor-grade reference answers for 7,000+ written exam questions.

View plans Browse library

← Browse more questions

Prepare on Android — MeoMock on Google Play