← MeoMock / Written exams
Class 2 (2nd Engineer) MEKM 📅 Dec 2022

Exam Question

With reference to a waste heat boiler economiser.

(a) Write a procedure for the cleaning the gas side of an exhaust gas boiler/economiser when the associared main engine is:

(i) Running (5)

(ii) Stopped. (5)

(b) Write a procedure for operation of the main engine when the associated waste heat boller economiser cannot be operated due to tube railure (6)

Reference Answer

Answer not yet available. Browse the exam library.