With reference to auxiliary boiler safety valves:

(a) Describe with the aid of sketch, the safety valves for an auxiliary boiler

(b) Identify, with reasons, the parts that require particularly close attention during overhaul

(c) Describe how the safety valves are reset after an overhaul.