← MeoMock / Written exams
Class 2 (2nd Engineer) SC&S 📅 Oct 2024

Exam Question

With regard to ship construction details for transverse watertight bulkheads:

(a) State the purpose of this type of bulkhead. (3)

(b) State how the bulkheads are tested for water tightness. (3)

(c) If it is necessary to penetrate the bulkhead, precaution must be taken to ensure that the watertight integrity and the strength of the bulkhead is maintained. With this in mind, describe, using simple sketches, how the following pass-through bulkheads. (10)

(i) Main transmission shaft.

(ii) Electrical cables.

(iii) Fuel oil transfer pipes.

(iv) Air and sounding pipes.

Reference Answer

(a) The purpose of transverse watertight bulkheads includes:
Providing sufficient strength to contain flooding in the event of a compartment or one side of the bulkhead being bilged, preventing water from spreading.
Acting as hull-strengthening members by carrying a portion of the ship's vertical loading.
Separating incompatible cargos to prevent contamination or hazardous reactions.

Full answer on MeoMock — surveyor-grade reference answers for 7,000+ written exam questions.

View plans Browse library

← Browse more questions

Prepare on Android — MeoMock on Google Play