With regards to process control system explain following: (16) 

(a) Proportional Control 

(b) integral Control 

(c) Derivative Control 

(d) The necessity of Derivative control

Reference Answer

### Process Control Systems: P, I, and D Actions
Process control systems are fundamental to the safe and efficient operation of a ship's machinery. They automatically maintain a desired process variable (PV) at a specific set point (SP). The controller achieves this by calculating an error signal (e = SP - PV) and producing an output to a final control element (e.g., a valve). The most common control strategy combines Proportional (P), Integral (I), and Derivative (D) actions.
---
### (a) Proportional Control (P-Action)