← MeoMock / Written exams
Class 2 (2nd Engineer) MEKG 📅 Jul 2019

Exam Question

With Respect to Exhaust Gas fired auxiliary boilers:

(a) Describe the procedure to be adopted for the inspection of a safety valve fitted to an exhaust gas fired auxiliary boiler stating, with reasons, Which parts should receive particularly close attention.

(b) Describe the procedure for the setting of safety valves of exhaust gas fired auxiliary boilers.

(c) Explain the action taken after the setting of safety valves as in (b).

Reference Answer

(a) Procedure for the inspection of the safety valve:
Safety:
Carry out a Toolbox meeting, Risk assessment and Permit to work.
Ensure that the internal pressure of the boiler is fully relieved before attempting to remove the safety valve. Wear appropriate personal protective equipment (PPE), including safety glasses, to protect against residual fluid splashes.

Full answer on MeoMock — surveyor-grade reference answers for 7,000+ written exam questions.

View plans Browse library

← Browse more questions

Prepare on Android — MeoMock on Google Play